Skip to content
Storytelling Co Lifestyle

How to compare scranton products solid plastic and phenolic partitions before you request a quote

Originally Posted On: https://islandsupplyinc.com/blogs/news/how-to-compare-scranton-products-solid-plastic-and-phenolic-partitions-before-you-request-a-quote

How to compare scranton products solid plastic and phenolic partitions before you request a quote

What You'll Need

Gather this before you start comparing. It saves a second round of emails with your supplier.

  • Drawings: floor plans or restroom layouts showing stall count, room dimensions, and any ADA clearances.

  • Field measurements (replacement jobs): existing pilaster height, door width, and mounting type (floor-mounted, overhead-braced, or ceiling-hung).

  • Layout details: hinge side, door swing direction, and whether you need urinal screens or a privacy partition.

  • Material shortlist: solid plastic (HDPE) and phenolic, with a note on room conditions like wet areas, high traffic, or vandal-prone spots.

  • Color chart: the Scranton Products chart for each material, since the finishes differ between them.

  • Hardware preferences: latch style and finish, plus any Hiny Hiders hardware or parts you need to match on an existing install.

  • Warranty and lead time needs: your job schedule, so you can check it against typical lead times of 1-2 weeks standard or 3-4 weeks custom.

  • Installation instructions: the manufacturer's install sheet for your pick, ready to review with your install crew.

  • Skills: basic plan reading and takeoff. Nothing more technical than that.

  • Approximate time: about 1-2 hours to compare materials and pull your package together. Island Supply Inc. guarantees a quote within 24 business hours once you send it.

Pick the wrong partition material and you'll hear about it for years. Not from the architect, either. From the owner, every time a panel delaminates or a door sags. Most of those calls trace back to one decision made before anyone requested a quote.

Scranton Products makes it easy to get that decision wrong, because the catalog is broad. Hiny Hiders, Accurate, Santana, and Comtec each cover different ground, and two of the biggest choices, solid plastic (HDPE) and phenolic, look close on a spec sheet but behave very differently in a wet locker room or a busy public restroom.

After twenty years of pricing commercial interiors, the pattern is clear. Contractors who compare materials side by side, with drawings and a hardware plan in hand, get clean quotes and fewer surprises on the jobsite. Contractors who skip that step end up reordering. So what should you line up first?

What You'll Get Done and What to Have Ready Before You Start

A contractor gets a call on Monday: the owner wants the restroom partitions swapped in a school wing, and the budget meeting is Friday. He sends a vague email asking for "plastic stalls" and gets back three mismatched quotes. Sound familiar? That's what happens without prep work.

The goal: a side-by-side material pick you can defend to the owner

The finish line is simple. One comparison of solid plastic against phenolic, built on the same stall layout, so the owner sees an honest match. Lead with Scranton products as your baseline line, then check HDPE panels against phenolic for moisture, wear, and scratch resistance. Reading Scanton Hiny Hiders specs alongside your notes keeps the comparison tight.

Materials and info to gather: drawings, stall count, hinge side, door swing, mounting type, and color chart choices

Pull this together first. It takes maybe an hour.

  • Drawings: floor plans or field sketches with dimensions.

  • Stall count: standard, ADA, and any urinal screens.

  • Hinge side and door swing: in or out, left or right.

  • Mounting type: floor-mounted, overhead-braced, or ceiling-hung.

  • Color chart picks: two or three choices per material.

  • Hardware notes: latch style and any replacement parts needed.

Skip one item and the quote comes back with assumptions.

Assumptions cost you change orders.

Step 1: Sort Out the Scranton Products Lines (Hiny Hiders, Accurate, Santana, Comtec) and Where Each Fits

Four brands, one parent company.

That's the first thing to pin down before anyone requests a quote. Scranton Products sells Hiny Hiders, Accurate, Santana and Comtec, and each one covers a different material and budget tier. Start with the Scranton partitions page to see which lines are available for your job, then match one to the spec.

Match the brand to the job: Hiny Hiders HDPE solid plastic vs. phenolic lines

Hiny Hiders is the HDPE solid plastic line. It doesn't rust, delaminate or swell, so it suits wet, high-traffic rooms. Phenolic lines cost more in most bids, but they give a harder, flatter surface that many architects prefer. Use this quick sort:

  • Wet or heavily cleaned rooms: HDPE solid plastic.

  • Premium look, tight spec: phenolic.

  • Replacement jobs: confirm the existing brand first, because hinge and latch hardware and parts rarely cross over.

Don't forget privacy add-ons. Ask for urinal screens in the same material so finishes match.

Check the color chart for your material before you lock in a finish

Colors aren't identical across materials. A shade offered in phenolic may not exist in HDPE. Pull the color chart for the exact material, then confirm it with your supplier. Do this before the drawings go out, not after.

Step 2: Compare Solid Plastic (HDPE) and Phenolic on Moisture, Wear, and Vandal Resistance

Which material actually survives your restroom? That's the question to settle before any quote request goes out. Both options sit in the Scranton toilet partitions lineup — they behave very differently once water and traffic show up.

Where HDPE toilet partitions earn their keep: pools, locker rooms, and wet areas

HDPE doesn't absorb water. Period. That makes solid plastic the safer pick for pools, locker rooms, and shower areas, where steam and splashing would wear down other cores. Color runs all the way through, so a scratch doesn't show a different layer. Pair the panels with matching urinal partitions so the finish stays consistent across the room.

Where phenolic wins: tighter finishes, high-traffic public restrooms, and Color-Thru options

Phenolic is stiffer and holds a crisper edge. It suits busy public restrooms and schools where graffiti and hard use are routine. Color-Thru phenolic, such as Bobrick's SierraSeries, withstands over 5.3 kg (11.7 lbs) of applied scratch force.

  • Choose HDPE for constant moisture.

  • Choose phenolic for rigid panels and heavy foot traffic.

Warranty terms to confirm in writing for each material

Don't assume. Ask for the warranty length, what it covers, and whether hardware such as latches is included. Bobrick SierraSeries Color-Thru phenolic carries a 25-year warranty, but confirm the exact terms for your chosen line before ordering.

Step 3: Check Hardware, Latches, and Parts Compatibility Before You Commit

Hardware is the first thing to fail on a partition, and it's rarely the panel's fault. Every estimator has seen a 25-year-rated panel limping along with a cracked latch. So don't stop at the panel material.

Hiny Hiders latch and hardware options and why they matter on replacement jobs

On a swap-out, the new door has to match existing pilaster — bracket spacing. Check the latch style, hinge type, and finish against the Hiny Hiders partitioms line before you approve a quote. Mismatched hardware means drilling new holes in panels that are staying put. Ugly.

Confirm Scranton Products parts availability for future repairs

Ask whether Scranton Products parts like latches, brackets, and hinges ship separately. Then get that answer in writing. Do it now. Not after the first vandalized door.

  • Latch and keeper: confirm model and color finish.

  • Hinges and brackets: confirm they fit HDPE and phenolic alike.

  • Color chart match: verify the finish on any spare parts.

Review installation instructions and mounting configurations with your install crew

Hand the installation instructions to the crew before anything ships. Walk through the mounting configuration (overhead-braced, floor-anchored, or ceiling-hung) against the actual slab and ceiling conditions. For commercial restroom partitions, that ten-minute review catches most field surprises. Surprises cost days.

Step 4: Build Your Quote Request Package and Send It

Sending a quick email that says "need 12 stalls, solid plastic" isn't a request. It's a guess. A vague ask gets a vague answer, and that's how a two-day quote turns into a two-week back-and-forth. Contractors who pack the request once get one clean number back. Simple as that.

What to include: drawings, material choice, color, hardware finish, quantities, and lead time needs

Gather everything before you hit send. For Scranton products jobs, here's the short list:

  • Drawings: floor plans or field sketches with stall widths, depths, and wall conditions.

  • Material: solid plastic (HDPE) or phenolic, based on your comparison.

  • Color: pick from the color chart and note a backup choice.

  • Hardware finish: latch, hinges, and brackets, plus the mounting type.

  • Quantities: stalls, urinal screens, and any spare parts.

  • Lead time needs: your install date, stated plainly.

Working with Hiny Hiders panels? Say so, and list any replacement latch or hardware you need to match. Replacement jobs especially benefit from existing model details (photos help).

Plan around typical lead times: 1-2 weeks standard, 3-4 weeks custom

Standard orders typically ship in 1-2 weeks.

Custom work runs 3-4 weeks. Back your schedule up from the installation date, not toward it. Island Supply guarantees a quote within 24 business hours, so the quote is rarely the bottleneck. Approvals are.

Troubleshooting, Common Mistakes, and How to Verify Your Quote Is Right

A renovation sub gets a crate of Scranton Products panels on a Tuesday. The pilasters are 3 inches too short for the floor-to-ceiling gap, and the door swings the wrong way. Nobody caught it on paper. Now the job sits for weeks while a re-order ships.

Mistakes that cost you a re-order: wrong pilaster height, missing hinge side, mismatched hardware

Most re-orders trace back to three slips. Check each one before you sign off.

  • Pilaster height: Measure the actual floor-to-ceiling run, not the plan dimension. Old slabs aren't level.

  • Hinge side: Mark door swing and hinge side on every stall. A missing note means a guess.

  • Hardware: Latch, hinges, and brackets must match the material. HDPE and phenolic don't always take the same parts.

Does the quote list hiny hiders toilet partitions with the hardware finish spelled out? If not, ask.

Final check: compare the quote line by line against your drawings, material, color chart, and install instructions before approving

Slow down here. Fifteen minutes now beats three weeks later.

  1. Match every stall count and size to your drawings.

  2. Confirm the material: solid plastic or phenolic.

  3. Check each color name against the manufacturer's color chart.

  4. Read the installation instructions and confirm every listed part is on the quote.

Anything unclear? Send it back before approving.

How-To FAQ

How long does it take to compare solid plastic and phenolic partitions?

Plan on one to two hours if your drawings and stall count are ready. Most of that time goes to checking the color chart and hardware options for each material. Pulling the specs side by side before you call saves a round of back-and-forth.

Which is the better pick for wet areas, solid plastic or phenolic?

Solid plastic (HDPE) is the safer pick for pools, locker rooms, and other wet spots. It doesn't absorb moisture, so it won't swell or delaminate. Phenolic holds up well in dry to moderately damp public restrooms, but constant water exposure is where HDPE earns its keep.

What do I do if I can't find the right Hiny Hiders latch or hardware?

Send the existing hardware details and a photo with your quote request. On replacement jobs, match these before you order:

  • Latch type and finish

  • Hinge side and door swing

  • Mounting type (floor-anchored, overhead-braced, ceiling-hung)

A photo of the old parts clears up most mismatches fast.

What are the most common reasons a partition quote comes back wrong?

Missing or wrong details on the request cause nearly all of them. The usual culprits are the wrong pilaster height, an unstated hinge side, and hardware that doesn't match the panel line. Check the quote line by line against your drawings before you approve it.

How long should I expect to wait once the order is placed?

Standard orders typically run 1-2 weeks, and custom projects typically take 3-4 weeks. Build that window into your schedule before demo starts. If your install date is tight, say so in the quote request so lead time gets confirmed up front.

Do I need the installation instructions before I order?

Yes, review them early with your install crew. The instructions show the mounting configurations and clearances your layout has to meet. Catching a conflict on paper is far cheaper than catching it on the wall.

Picking between solid plastic and phenolic comes down to where the stalls will live. Wet areas like pools and locker rooms favor HDPE. Busy public restrooms with heavy foot traffic and a need for crisp finishes often favor phenolic. Neither choice is wrong, but each one has to match the room.

Contractors who sort out the Scranton Products brands early, then check hardware and parts compatibility before ordering, avoid the re-orders that eat schedules. Hinge side, door swing, pilaster height, and mounting type are small details. Missing one can stall a whole install.

A clean quote request starts with a complete package: drawings, stall count, material, color, hardware finish, and the lead time the job can tolerate. Standard orders typically run 1-2 weeks, and custom work 3-4 weeks. Island Supply guarantees a quote within 24 business hours.

Gather the drawings for the current job, confirm the material against its color chart, and send everything through the online quote tool or call (732) 363-1392. Then compare the returned quote line by line before approving.

Island Supply Partitions
500 River Avenue
Lakewood, NJ 08701
(732) 363-1392
https://islandsupplyinc.com